How a made-to-order build works

From spec to energized, without the guesswork.

"Made-to-order" can sound slow and risky — a custom unit, a distant factory, a date that keeps moving. Ours doesn't work that way. Here's exactly what happens after you call, and where you're in control.

At a glance

From first call to energized

  1. 1ConsultDay 0
  2. 2DesignWeek 1
  3. 3QuoteWeek 1
  4. 4BuildBuild
  5. 5TestPre-ship
  6. 6DeliverScheduled
Step by step

Six steps. One accountable team.

At every checkpoint there's a tangible thing in your hands — an approval, a date, a report. If a build hits a snag, you hear it from us first, with a plan.

  1. 1

    Talk it through

    We start with your project, not a part number. Tell us the load, the site, the voltage, and the date you need power — and we ask the questions that surface the things a spec sheet misses.

    Your partShare spec, site & timeline
    We handleAsk the right questions
    You walk away withScope confirmed
  2. 2

    Engineer to spec

    Our engineers turn that scope into a real design — ratings, impedance, bushings, footprint — and put drawings in front of you. Nothing gets built until you've signed off on them.

    Your partReview & approve drawings
    We handleEngineer to your exact spec
    You walk away withApproved drawings
  3. 3

    Quote & schedule

    You get a firm price and a real ship date — not a range and a shrug. The schedule we commit to is the schedule we own, because the whole build is under our roof.

    Your partIssue the PO
    We handleLock price & ship date
    You walk away withFirm quote + ship date
  4. 4

    Build it

    Core and coil, tank, and final assembly move on the date we committed to. Because it's in-house, a change order or a rush doesn't mean starting over with a stranger.

    Your partNothing — we've got it
    We handleManufacture to print
    You walk away withUnit in production
  5. 5

    Test before it ships

    Every unit goes through full factory testing before it leaves the floor, and you get the report. The first time it's energized shouldn't be the first time anyone checked it.

    Your partReceive the test report
    We handleFull factory testing
    You walk away withTest report issued
  6. 6

    Deliver & energize

    We manage the hauling, the set, and the start-up — and our field team is on call long after. One partner from the first call to the day it carries load, and for the decades after.

    Your partTell us where & when
    We handleHaul, set & commission
    You walk away withEnergized on site
No black box

You're never guessing where it is

At every checkpoint there's a tangible thing in your hands — an approval, a date, a report. If a build hits a snag, you hear it from us first, with a plan.

  • Scope confirmed
  • Drawings approved
  • Firm ship date
  • Test report issued
  • Energized on site
Start at step one

Let's talk through your build

Bring the spec, the site, and the date. We'll handle the rest — and tell you exactly when it ships.